SB 1211 for Fourplex / 4-unit in Downey

Own a fourplex / 4-unit in Downey? SB 1211 lets you stack 5 new units on top of your existing 4: 4 detached + 1 interior. At Downey's median rent of $2,300/mo, that's ~$138K in additional gross annual rent.

5new homes possible
4detached ADUs
1interior conversions
$138Kest. annual rent

The Downey scenario

Picture the typical case: a 4-unit fourplex / 4-unit on a Downey block built between 1955 and 1975, with surface parking that hasn't been fully utilized in years. SB 1211 turns that parking into 4 detached units plus 1 interior conversion — 5 new doors that didn't exist before 2024.

Downey-specific note: Stable rental demand.

Small multifamily (2–4 unit) design playbook

Small multifamily lots are usually constrained on width before they're constrained on count. With a 4-unit existing footprint, the binding constraint becomes side-yard setbacks (4 ft min) and the 18-ft height limit. Two-story stacked-flat ADUs over surface parking are the highest-yield typology.

Pro-forma snapshot

Existing units4
Detached ADUs (SB 1211)4
Interior conversions1
Total new units5
Median 1BR rent in Downey$2,300/mo
Est. additional gross rent$138K/yr
Estimated total project cost~$1,344K
Year-1 NOI estimate~$104K
Stabilized cap rate at cost7.7%
Replacement parking requiredNo (§66313)
Approval pathwayMinisterial · §66314
Typical permit timeline in Downey70-115 days

Get a personalized SB 1211 feasibility report for fourplex / 4-unit owners in Downey

3 minutes. We email you a 4-page PDF with your buildable count, parking determination, jurisdiction overlays, and pro-forma.

No spam · free · delivered in 24 hrs

Other property types in Downey

Duplex in Downeyup to 3 new homesTriplex in Downeyup to 4 new homes5-unit apartment in Downeyup to 6 new homes6-unit apartment in Downeyup to 7 new homes8-unit apartment in Downeyup to 10 new homes10-unit apartment in Downeyup to 10 new homes12-unit apartment in Downeyup to 11 new homes16-unit apartment in Downeyup to 12 new homes20-unit apartment in Downeyup to 13 new homes24-unit apartment in Downeyup to 14 new homes32-unit apartment in Downeyup to 16 new homes

Fourplex / 4-unit owners in other LA Metro cities

Fourplex / 4-unit in Los Angeles~$144K/yr rent · 60-120 daysFourplex / 4-unit in Long Beach~$150K/yr rent · 70-110 daysFourplex / 4-unit in Santa Monica~$210K/yr rent · 90-140 daysFourplex / 4-unit in Glendale~$156K/yr rent · 75-120 daysFourplex / 4-unit in Pasadena~$162K/yr rent · 75-130 daysFourplex / 4-unit in Burbank~$156K/yr rent · 70-115 daysFourplex / 4-unit in Alhambra~$138K/yr rent · 75-120 daysFourplex / 4-unit in Torrance~$150K/yr rent · 75-120 daysFourplex / 4-unit in El Monte~$132K/yr rent · 70-115 daysFourplex / 4-unit in Inglewood~$144K/yr rent · 75-115 daysFourplex / 4-unit in Pomona~$126K/yr rent · 70-115 daysFourplex / 4-unit in Lancaster~$102K/yr rent · 60-100 days

Topics relevant to this scenario

Existing vs proposed buildings under SB 1211Fire code compliance for SB 1211 ADUsUtility hookups for multifamily ADUsImpact fees on SB 1211 ADUsFinancing multifamily ADUs under SB 1211HCD-approved modular ADUsSB 1211 and rent controlHOAs and SB 1211